Capital Renovation and Renewals
Capital Renewal and Renovation (CRR) projects are Measure HH–funded improvements that keep campus facilities safe, functional, and up to date. Unlike the district's major construction initiatives, CRR projects are typically discrete, targeted renovations, replacements, and upgrades - though their scope and cost can vary widely, from minor fixture replacements to larger system overhauls. Nearly 200 CRR projects are planned, underway, or closed out across the district's campuses, spanning four core categories:
- Infrastructure Upgrades – Renewing or replacing essential mechanical, electrical, and plumbing (MEP) systems, such as chillers, wiring, and utility components.
- Safety & Code Compliance – Site improvements addressing immediate safety priorities, security upgrades, and accessibility modifications (ADA compliance).
- Facility Modernization – Minor room remodels, interior refurbishments, and updates to aging fixtures or finishes in active-use spaces.
- Site Improvements – Exterior touch-ups, pathway upgrades, security gate installations, and localized fixture replacements.
Given the high volume of CRR work, projects under $220,000 in construction value are generally smaller in scope and closed out on a short timeline, often within days or weeks rather than months or years. These projects are tracked collectively in the tables below rather than given individual project pages. Larger or longer-duration CRR projects, which involve more extensive planning and construction, are featured on their own dedicated project page.
San Diego City College
Active Projects
| Project Title | Expected Start Date |
|---|---|
| Learning Resource Center & Library (R) Building – Roofing | Jun 01 - Jun 05, 2026 |
| Health, Exercise Science & Athletics (P) Building – Roof Replacement | Jun 15 - Jun 19, 2026 |
| Arts & Humanities (AH) Parking Structure (P300) – Building East Overhead Roll-Up Door | Jun 22 - Jun 26, 2026 |
| Hardscape Improvements | Jul 13 - Jul 17, 2026 |
| Academic Success Center (L) Building and Early Education Center (F) Building – Panic Buttons | Aug 24 - Aug 28, 2026 |
| Business & Technology (BT) Building – Restroom | Sep 07 - Sep 11, 2026 |
| Career Technology Center (V) Building – Auditorium Seating & Carpet Improvements | Dec 21 - Dec 25, 2026 |
Closed Out Projects
| Project Title | Lead Builder | Construction Start | Construction End | Project Description | Photo |
|---|---|---|---|---|---|
| Business & Technology (BT) Building – Security Gate Installation | South Bay Fence | July 01, 2026 | August 02, 2026 | Installed new metal fencing with protective screening and a self-closing swing gate to deter tampering, prevent unauthorized access and provide a more secure, controlled area for authorized personnel. | NA |
| Garfield Parking (Lot 3) Structure – Upgrade Existing Elevator | 24 Hour Elevator | June 25, 2026 | July 24, 2026 | Modernized the existing elevator with new controls, safety features and accessibility improvements to provide more reliable and accessible service. Upgrades include enhanced emergency and fire response features, improved door safety sensors, Braille signage, audible notifications, an ADA-compliant speakerphone and updated interior safety equipment. | NA |
| Business & Technology (BT) Building – North Side Security Fencing | South Bay Fence | June 15, 2026 | June 30, 2026 | Installed new metal security fencing atop an existing concrete wall, along with a swing gate, to provide controlled access for authorized personnel and prevent unauthorized entry. | NA |
| Fitness Center (P-2) Building – Physical Accessibility Improvements for Students with Disabilities | Innerface Signage | April 06, 2026 | April 06, 2026 | Improved physical accessibility by updating accessibility signage, parking stalls, striping and paths of travel to meet ADA requirements and provide safer, more functional access for students with disabilities. | NA |
| Saville Theatre & Garfield Parking (Lot 3) Structure – Exterior Lighting Improvements | Rod Fuller Electric Corporation dba Fuller Electric | March 31, 2026 | April 03, 2026 | Installed new exterior lighting to improve visibility, increase safety, and create a more secure campus environment after dark. | View |
| Student Services and Administration (A) Building – Security Fence & Swing Gate Installation | South Bay Fence | March 26, 2026 | March 26, 2026 | Installed new security fencing and swing gates to secure previously open areas, enhance access control, and support a safe campus environment. | View |
| Learning Resource Center & Library (R) Building – Air Handling Unit Replacement | ACCO Engineered | December 21, 2025 | March 20, 2026 | Installed key heating and ventilation equipment, including new boilers, ductwork and hot water piping, to improve airflow, heating and system reliability while supporting a more comfortable indoor environment for students and employees. | NA |
| Learning Resource Center & Library (R) Building – Emergency Call Boxes | ACI Communications | February 04, 2026 | March 19, 2026 | Installed emergency call boxes to strengthen campus safety by providing quick, direct access to emergency assistance when needed. | View |
| Science (S) Building – Hot Coil Replacement | ACCO Engineered | January 26, 2026 | February 25, 2026 | Replaced aging heating coils in the air handling system to improve the reliability of the building's heating system and help maintain a comfortable indoor environment for students, faculty, and staff. | View |
| Career Technology Center (V) and Math and Social Sciences (MS) Building – Gate Door Replacement | Suffolk Construction Company, Inc. | November 24, 2025 | February 06, 2026 | Replaced the overhead roll-up doors to improve the security, reliability, and functionality of these campus facilities. | View |
| Student Services and Administration (A) Building – Career Center Room 301 Remodel | All Source Company Building Group | December 21, 2025 | January 31, 2026 | Renovated the Career Center with updated walls, new ceilings, carpet, paint and a reorganized layout to better support day-to-day career services. The modernized environment provides a more functional and welcoming space for students preparing for internships, careers and transfer opportunities. | View |
| Soccer Field Turf Replacement | KYA Services, LLC | December 01, 2025 | January 23, 2026 | Replaced the deteriorated soccer field turf to address an immediate safety need, ensuring student athletes could continue training and competing on campus while the more significant Outdoor Athletics Expansion and Upgrades project advances. | View |
| Educational Technology Center (B) Building – Window Replacement | C & C Glass | Cleaned and resealed six sections of the existing window system as part of improvements to the building exterior. | NA |
San Diego Mesa College
Active Projects
| Project Title | Expected Start Date |
|---|---|
| Learning Resource Center (LR) Building - Elevator Modernization | Jun 01 - Jun 05, 2026 |
| Center for Business & Technology (BT), Math & Science Complex (MS), Police Offices (Q1&Q2), Allied Health Education (S), Social & Behavioral Sciences (SB), Merrill Douglas Stadium (East & West) - Lighting Inverter & Batteries | Jun 22 - Jun 26, 2026 |
| Hardscape Improvements | Jun 29 - Jul 03, 2026 |
| Allied Health Education (S) Building - HVAC, Exhaust Fans & Boiler, and ALC Controls | Jul 27 - Jul 31, 2026 |
| Mesa Commons (MC) Building - Envelope Leak Mitigation | Jul 27 - Jul 31, 2026 |
Closed Out Projects
| Project Title | Lead Builder | Construction Start | Construction End | Project Description | Photo |
|---|---|---|---|---|---|
| Pool Chemical Building - Double Doors Equip Area | Steven Sechen/Sechen Construction | June 29, 2026 | August 24, 2026 | Replaced deteriorated exterior doors and hardware at the equipment and chemical rooms and restored damaged areas surrounding the door openings. The improvements provide secure, reliable access while restoring the condition of the building exterior. | NA |
| Learning Resource Center (LR) - Building Carpet Replacement | Pro Installations Inc dba ProSpectra Flooring | June 18, 2026 | August 18, 2026 | Replaced existing carpet throughout all four floors of the Learning Resource Center, including the stairs, with new carpet tile and base. Work included preparing and leveling the existing floors before installation. The new Green Label Plus-certified carpet provides an updated and more functional environment for students and employees. | NA |
| Gym Floor Replacement | KYA Services, LLC | April 30, 2026 | July 17, 2026 | Replaced the outdated and damaged gym floor with a new competition-ready playing surface featuring updated striping for NCAA men’s and women’s basketball, volleyball and badminton, along with a new 6-by-8-foot Mesa College logo at center court. The improvements provide student-athletes with an updated space that supports multiple athletic programs. | NA |
| Learning Resource Center (LR) and Humanities and Multicultural Studies (G) Building - Fire Sprinkler Backflow Replacement | The Hiller Companies, LLC | June 19, 2026 | June 20, 2026 | Replaced two fire sprinkler system components after an inspection identified valves that were not fully closing and a continuous leak, ensuring the fire sprinkler systems operate properly. | NA |
| Learning Resource Center (LR) - Level 3 Emergency Exit Guardrail | Scott Fence | May 08, 2026 | May 11, 2026 | Installed a new exterior guardrail and barrier outside the Level 3 emergency exit to provide a protected and clearly defined path of travel to the roof stairwell, reducing the fall hazard associated with the previously unprotected roof area. | NA |
| Mesa Commons (MC) Building Roof Gutter Replacement | ZNTH, INC. | February 13, 2026 | A deteriorated roof gutter above the Culinary Academy deck was replaced after rust and water leaks began impacting the patio entrance. | View | |
| Baseball Field Net & Fencing Replacement | Scott Fence, Inc. | January 09, 2026 | February 07, 2026 | Replaced and upgraded fencing and protective netting at the baseball field to enhance safety for student athletes, spectators, and the surrounding campus while supporting a high-quality playing environment. | View |
| Humanities and Multicultural Studies (G) Building - Chiller Condenser Coil Replacement | ACCO Engineered | August 13, 2025 | January 27, 2026 | Replaced the condenser coil in the chiller system in the college's Central Plant (G Building) to maintain reliable cooling and provide a comfortable learning and working environment for students, employees, and visitors. | View |
| Animal Health Technology (P300) Building - Roofing Glazing Sealant | Roof Construction | November 24, 2025 | January 22, 2026 | Restored watertight conditions at the Harry West Gymnasium (P-3 Building) by resealing key roof components, clearing debris from roof drains and surfaces, and completing a full roof cleaning to help protect the building from water intrusion. | View |
| Child Development Center (CDC) Building - Roof | Garland DBS | November 24, 2025 | November 26, 2025 | A new fluid-applied roof coating system was installed at the Early Education Center (F Building) to address reported leaks and improve protection for the existing roof systems. | View |
| Storm Drain & Slope Stabilization | Align Builders Inc. | July 14, 2025 | October 31, 2025 | Improved the stormwater drainage system and stabilized the canyon slope to reduce erosion, better manage stormwater runoff, and help protect campus infrastructure. | NA |
| Administration Offices (A) Building – Electrical System Improvements | MCM Utility Services, Inc. | June 29, 2026 | Stabilized a leaking electrical transformer by inspecting the equipment and addressing the source of the leak to support safe, reliable operation. The improvements help maintain building operations until the facility transitions into a future bond-funded phase. | NA |
San Diego Miramar College
Active Projects
| Project Title | Expected Start Date |
|---|---|
| Hourglass Park - Hardscape Improvements | May 11 - May 15, 2026 |
| Police Academy (A-2) Building - Tenant Improvement | May 25 - May 29, 2026 |
| Diesel Technology (C-2), Parking Garage (G-3, G-4), (E), Arts & Humanities (H), Fitness Center (J-2), Student Resource & Welcome Center (K-2), Administration (N), Aquatic Center (P), Science (S-6), Learning Resource Center (LRC) - Lighting Inverters & Batteries | Jun 15 - Jun 19, 2026 |
| Police Academy (A-2) Building - HVAC | Jun 29 - Jul 03, 2026 |
| Arts & Humanities (H), Business & Math (M), Science (S-5), Campus Police (T-1) - Roof Replacement and Diesel Technology (C-1), Learning Resource Center (LRC) - Gutters | Jul 06 - Jul 10, 2026 |
| Heavy Duty Advanced Transportation (C-3) - Rollup Doors | Aug 24 - Aug 28, 2026 |
Closed Out Projects
| Project Title | Lead Builder | Construction Start | Construction End | Project Description | Photo |
|---|---|---|---|---|---|
| Police Academy (A-2) Building - Mat Room HVAC | Able Heating & Air Conditioning | May 04, 2026 | August 14, 2026 | Upgraded the HVAC system with a new air-conditioning unit designed to meet the needs of the space and provide more reliable temperature control. | NA |
| Hardscape Improvements | Precision Concrete Cutting | June 05, 2026 | July 20, 2026 | Improved pedestrian safety by smoothing uneven concrete surfaces along sidewalks and other paved areas to reduce or eliminate trip hazards. | NA |
| Central Plant Chiller CH-3 Harmonic Filter System Upgrade | May 11, 2026 | May 22, 2026 | Upgraded the electrical filtering system with new controls and components to improve power quality and support reliable chiller operation. | NA | |
| Building N & M Trip Hazard Mitigation | PowerOn Energy, Inc | March 30, 2026 | April 08, 2026 | Replaced uneven walkways around trees near the Administration Building (N Building) to eliminate trip hazards and improve safety and accessibility for students, employees, and visitors. | View |
| Building W Distribution and Computing Center Fire Sprinkler Upgrade | RJ Nichols Construction, Inc. | August 04, 2025 | September 26, 2025 | Upgraded the piping that supports the district's Distribution and Computing Center (W Building) fire sprinkler system to strengthen the reliability of the building's fire protection and help protect people, facilities, and campus resources. | View |
College of Continuing Education
Active Projects
| Project Title | Expected Start Date |
|---|---|
| Harbor View - Hardscape Improvements | Jun 22 - Jun 26, 2026 |
| Harbor View - 3rd Floor Patio Tile Replacement Mid-City Joint Sealant |
Jul 27 - Jul 31, 2026 |
Closed Out Projects
| Project Title | Lead Builder | Construction Start | Construction End | Project Description | Photo |
|---|---|---|---|---|---|
| Educational Cultural Complex (ECC) - HVAC | ACCO Engineered | June 05, 2026 | August 31, 2026 | Replaced the existing rooftop HVAC unit with a new heat pump system, including updated ductwork, electrical connections and controls, to improve heating and cooling performance and support reliable operation. | NA |
| Panic Button Systems (West City, Mesa) |
JJJ Enterprises | February 20, 2026 | April 29, 2026 | Installed new panic button systems at several campuses for the College of Continuing Education to strengthen emergency response capabilities and support a safe learning and working environment. The campuses included North City, West City, the Educational Cultural Complex (ECC), the Harbor View Campus, and the Continuing Education Mesa College Campus. | NA |
| Panic Button Systems (Harbor View, North City, Educational Cultural Complex) |
Moor Electric, Inc | April 06, 2026 | April 10, 2026 | Installed new panic button systems at several campuses for the College of Continuing Education to strengthen emergency response capabilities and support a safe learning and working environment. The campuses included North City, West City, the Educational Cultural Complex (ECC), the Harbor View Campus, and the Continuing Education Mesa College Campus. | NA |
| West City - Emergency Evacuation Chairs | School Health Corp | April 01, 2026 | April 01, 2026 | Installed an emergency evacuation chair to provide a safe way for people with mobility impairments to evacuate the building during an emergency, strengthening campus safety and emergency preparedness. | View |
| Educational Cultural Complex (ECC) - Dual Swing Door Operator | ASSA ABLOY Entrance Systems US Inc. | February 27, 2026 | March 19, 2026 | Installed an automatic door system at the Educational Cultural Complex (ECC) south entrance to improve accessibility and provide easier entry for people using wheelchairs, walkers, and other mobility devices. | View |
District Facilities
Active Projects
| Project Title | Expected Start Date |
|---|---|
| District Office - Electronic Key Cabinet | Sep 07 - Sep 11, 2026 |
Closed Out Projects
| Project Title | Lead Builder | Construction Start | Construction End | Project Description | Photo |
|---|---|---|---|---|---|
| Hardscape Assessment & Improvements | Precision Concrete Cutting | June 26, 2026 | July 23, 2026 | Improved pedestrian safety by smoothing uneven concrete surfaces along sidewalks and other paved areas to reduce or eliminate trip hazards. | NA |
| District Services Center - South Roof | Preman Roofing, Inc | January 23, 2026 | May 14, 2026 | Restored the southern portion of the roof to improve weather protection, help prevent water intrusion and extend the life of the existing roof. | View |
| District Wide - Mobility Device Signage Installation | Traffic Tech | April 27, 2026 | May 08, 2026 | Approximately 50 mobility device signs were installed across eight campuses, replacing outdated signage and providing clearer, more consistent wayfinding for students, faculty, staff and visitors. | NA |
Last updated: October 15, 2026